Sechan has been certified to Capability Maturity Model Integration (CMMI) Level 3 by a Software Engineering Institute (SEI) Authorized Lead Appraiser. Sechan's electronics department follows CMMI Level 3 and ISO 9000 procedures for design process that include project planning, project inventory and control, product integration, verification, and validation.
The table below lists each CMMI Process Area and the associated Sechan Standard Operating Procedure that forms a part of the design process.
| CMMI Process Area |
Sechan Standard Operating Procedure (SOP) |
| Requirements Management |
90.DD.300 Preliminary Design and Requirements Management |
| 90.DD.900 Requirements Development and Management |
| Project Planning |
90.DD.200 Design Program Planning |
| 90.DD.220 Estimation |
| 90.MG.111 Contract Review and JOA Development and Revision |
| Project Monitor and Control |
90.DD.200 Design Program Planning |
| 90.DD.210 Program Monitoring |
| Supplier Agreement Management |
90.DD.230 Subcontracting |
| 90.MA.100 Supplier Evaluation and Selection Criteria |
| 90.MA.200 Purchase Order Development |
| 90.MA.400 Approved Supplier Performance Rating |
| 90.MA.500 Purchase Order Supplement |
| 90.MA.600 Receiving Inspection |
| 90.MA.800 Source Inspection |
| Measurement and Analysis |
90.DD.210 Program Monitoring |
| Process and Project Quality Assurance |
90.AM.100 Internal Quality System Audits |
| QAIS 20-10-01 Quality System Audit Guideline |
| QAIS 20-10-02 Internal Quality System Auditor Training |
| Document 90 Quality Policy Manual |
| 90.CA.100 Internal Corrective Action |
| Configuration Management |
Document 30 Configuration Management Manual |
| 90.DC.100 Initial Document Acquisition and Product Baseline Development |
| 90.DC.200 Engineering Change Order |
| 90.DC.300 Configuration Control Board |
| 90.DC.400 Customer Requested Changes |
| 90.DC.500 External Document Control |
| 90.DC.800 Drawing and Document Revision Control |
| Requirements Development |
90.DD.300 Preliminary Design and Requirements Management |
| 90.DD.900 Requirements Development and Management |
| Technical Solution |
90.DD.310 Trade Study |
| 90.DD.400 Drawing Development |
| 90.DD.500 Detailed Design |
| 90.DD.900 Requirements Development and Management |
| Product Integration |
90.DD.500 Detailed Design |
| Verification |
90.DD.600 Verification |
| 90.DD.900 Requirements Development and Management |
| Validation |
90.DD.800 Validation |
| 90.DD.900 Requirements Development and Management |
| Organizational Process Focus |
90.DD.001 Engineering Process Guide |
| Document 90 Quality Policy Manual |
| Organizational Process Definition |
90.DD.001 Engineering Process Guide |
| 90.DD.200 Design Program Planning |
| Document 90 Quality Policy Manual |
| Organizational Training |
90.TR.100 Employee Training Requirements |
| 90.DD.001 Engineering Process Guide |
| Document 90 Quality Policy Manual |
| Integrated Project Management |
90.DD.100 Product Design Overview |
| 90.DD.200 Design Program Planning |
| 90.DD.210 Program Monitoring |
| 90.DD.700 Design and Drawing Review |
| 90.DD.910 Meeting and Action Item Documentation |
| Risk Management |
90.DD.320 Risk Management |
| Decision Analysis and Resolution |
90.DD.310 Trade Study |